Process Crane

Conductor Bar System for Crane electrificationConductor Bar System for Crane electrificationConductor Bar System for Crane electrification
Downloads: 

2 Process Bridge Cranes in a cement plant

Application
2 Process Bridge Cranes in a cement plant

Country
Czech Republic

City
Radotín

Representative office
Conductix-Wampfler s.r.o. [CZ]

Operator
Českomoravský cement, a.s.

Technical requirement[s]
Energy Transmission Systems for 2 Process Bridge Cranes

System course
Straight

Length [System]
155 m

Product[s]
Conductor Rail System, Program 0813 SinglePowerLine

Quantity of poles
3 + PE

Current
800 A

Voltage
400 V

Environmental condition(s)
Very high dust loading