Recommend
Remove File
Remove document <span id="remove-document-name"></span> from <span id="remove-cart-name"></span>?
Reference Report
[REF0300-0005-E]
Application
Tunnel lining machine
Customer
Herrenknecht AG Tunnelvortriebstechnik
Location
roadworks in tunnel (Moscow)
Travel length
up to 600 m
Travel speed
average of 10 m/day
Festoon System
(Heavy Duty) Program 340; 4 systems
Quantity of cable trolleys
182
Total weight of cable trolleys
23 to.
Specific features
Tunnel lining machine with 4 units which move with different speed and compensate a grade of 5%