REF0831-0016 Transfer Car - IntralogisticREF0831-0016 Transfer Car - IntralogisticREF0831-0016 Transfer Car - Intralogistic
Downloads: 

Application
3 transfer cars in a high storage system

Country
Netherlands

City
Delfgauw

Representative office
Conductix-Wampfler B.V. [NL]

Project installation date
2018

Operator
Albert Heijn, distribution center

Technical requirement[s]
Power and control signal transmission to the transfer car

Product[s]
Conductor Rail System, Program 0831 MultiLine

Collector
Double collector assembly

System course
Straight

Length [System]
1 x 24 m + 2 x 71 m

Number of poles
• 4 [Power transmission]
• 3 [Transmission of the control signals]

Power
• 100 A [Power transmission]
• 10 A [Transmission of the control signals]

Additional information
• Retrofit: dismounting of the old Conductor Rail System
• Installation of the new Conductor Rail System
• Conductix-Wampfler installed the system together with the customer