Recommend
Remove File
Remove document <span id="remove-document-name"></span> from <span id="remove-cart-name"></span>?
Reference Report
[REF0832-0004-EN]
Application
High storage system with 7 aisles
Country
Netherlands
City
Delfgauw
Representative office
Conductix-Wampfler B.V. [NL]
Project installation date
2018
Operator
Albert Heijn, distribution center
Technical requirement[s]
Power and control signal transmission for storage/retrieval system
Product[s]
Conductor Rail System, Program 0832 EcoClickLine
Collector
Double collector assembly
System course
Straight
Length [System]
7 aisles each 68 m
Number of poles
• 4 [Power transmission]
• 3 [Transmission of the control signals]
Power
• 100 A [Power transmission]
• 10 A [Transmission of the control signals]
Additional information
• Retrofit: dismounting of the old conductor rail system
• Installation of the new conductor rail system
• Conductix-Wampfler installed the system together with the customer
• Difficult condition: Conductor Rail System had to be installed very close to the ground